Concrete Volume Calculator

Use this concrete calculator to estimate slab volume in cubic yards, cubic feet or cubic meters. Enter length, width and thickness, then add any measured sections.

Project measurements

Example values are editable. Check dimensions and product labels before ordering.

%
USD
Additional rectangular sections

Add non-overlapping rooms or pads. Exclusions and allowance are applied once to the combined quantity.

Price basis: per cubic yard, or per bag when entered. A blank optional quantity can be entered as 0.

Material estimate

Measured volume
1.133 m³
Measured volume
40 ft³
Measured volume
1.481 yd³
Volume with allowance
1.133 m³
Volume with allowance
1.481 yd³

Calculation trace

1.13267386368 m³ × 1 = 1.13267386368 m³

3.048 × 3.6576000000000004 × 0.1016 m = L × W × T

Price basis, when entered: USD per yd³.

Assumptions

  • Allowance explicitly selected: 0%.
  • Price excludes tax, delivery, labor and contingency.
  • Use actual product dimensions and manufacturer coverage.

Estimate the volume inside the forms, then decide how to buy it. A concrete calculator multiplies length, width and thickness, adds each separate rectangle, and applies the allowance you choose. Compare the resulting cubic yards with a ready-mix quote or convert the same volume to bags using the mixed yield.

Use this concrete calculator to estimate slab volume in cubic yards, cubic feet or cubic meters. Enter length, width and thickness, then add any measured sections. Work from the measurements for your actual project before you check price. If another material belongs on the same order, work out its quantity separately. For companion estimates and measuring advice, see How to Calculate Concrete for a Slab, Cubic Feet to Cubic Yards: Material Volume Conversion, Concrete Bag Calculator, Footing Concrete Calculator, Gravel Driveway Calculator. Read the CubicPilot calculation methodology for rounding, units and material assumptions.

How do you use this calculator?

  1. Select the shape if the tool offers a choice, then enter the primary measurements with their units.
  2. Enter the product’s actual label value when the form requests a yield, a package count, coverage or stock size.
  3. Choose an allowance explicitly. Read the measured and adjusted quantities before rounding any supplier order.

What should you enter?

Length
Primary length of the measured surface or run. Measure along the working face and keep the unit shown beside the field.
Width
Second footprint dimension, or full diameter when the circular option uses this field. Measure the concrete or material footprint itself, excluding form lumber and edging that will not be filled.
Slab thickness
Thickness or depth of the measured material. Measure only the layer being estimated and confirm the unit before entering.
Waste / allowance
The percentage you choose to add for ordering. Use zero if the supplied quantity already contains the allowance. Record why you add any extra.
Material price per purchase unit (USD)
Optional price in USD per purchase unit shown by the tool. Check the actual quantity basis in your quote. Compare taxes, transport and labor separately.

How is the estimate calculated?

Measured = sum of length × width × thickness per rectangular section. Convert cubic feet to yards by dividing by 27. Adjusted = measured × (1 + allowance / 100). Supplier order rounding is manual.

Measured ft³ = sum of (length ft × width ft × thickness in ÷ 12). Adjusted yd³ = measured ft³ × (1 + allowance ÷ 100) ÷ 27.

  • Convert dimensions to matching units before multiplying. Product-specific values come from your quote or label.

What measurements does the concrete calculator use?

For a garage apron, the delivery question often matters more than the number displayed on screen. Ask how much a truck can deliver in one order and how the supplier bills a partial load. For a sidewalk, verify that every section uses the intended concrete thickness before converting to bags. Moving the same depth from inches to feet without conversion produces a twelvefold error.

How much concrete does a garage apron or sidewalk need?

Garage apron

  • 20 × 20 ft, 6 in thick
  • 10% example allowance
  1. 20 × 20 = 400 sq ft.
  2. 6 ÷ 12 = 0.5 ft.
  3. 400 × 0.5 = 200 cu ft.
  4. 200 × 1.10 = 220 cu ft.
  5. 220 ÷ 27 ≈ 8.148 cu yd.

An illustrative quarter-yard seller would round up to 8.25 cu yd.

Check. 8.25 × 27 = 222.75 cu ft, which covers 220 cu ft.

Sidewalk

  • 4 × 30 ft, 4 in thick
  • 5% allowance and example 0.60 cu ft bag yield
  1. 4 × 30 = 120 sq ft.
  2. 4 ÷ 12 = ⅓ ft.
  3. 120 × ⅓ = 40 cu ft.
  4. 40 × 1.05 = 42 cu ft.
  5. 42 ÷ 0.60 = 70 bags.

70 whole bags at that label yield.

Check. 70 × 0.60 = 42 cu ft.

How does slab thickness change cubic yards?

At a constant 120 sq ft, before allowance
ThicknessCubic feetCubic yards
3 in301.111
4 in401.481
6 in602.222

A patio, shed pad or rectangular slab needs a volume estimate, not just square footage. Measure the inside of the forms and enter the planned thickness with its unit. Add thickened or differently sized sections separately rather than treating every part as the same slab.

When should you buy bags or order ready-mix?

Use quarter-yard and half-yard quotes only when those increments are confirmed. Compute the total measured geometry first. Apply the allowance next. Round the order once, using the actual increment. For bags, compare the number of packages, their total dry weight, unloading and mixer capacity with a delivered ready-mix quote. There is no fixed volume at which every supplier becomes cheaper.

Cubic yards describe a ready-mix volume; bags describe a product quantity. If you are buying bagged mix, take the calculated volume to the concrete bag calculator and use the mixed yield on the actual package. The calculator does not choose a safe slab thickness.

Do slab edges or separate pours change the total?

Use the inside form dimensions. Concrete already counted in the main slab should not appear at full thickness again in a thickened strip. Count only the extra depth over the area of that strip. Get unclear or load-bearing dimensions checked before buying, and call 811 before digging in the US.

What to check before ordering

  • Keep your measured estimate and purchase quantity on separate lines.
  • Compare the actual purchase units, handling and delivered prices.

Frequently asked questions

Can I use outside form dimensions?

Use the inside dimensions. Outside measurements count the timber as part of the concrete footprint and enlarge the order. If you are estimating from a drawing before the forms are built, record the finished inside dimensions and verify them when the forms are in place.

What if one section is thicker?

Measure the thicker part as a separate rectangle, or count only its extra depth when that footprint is already included in the main slab. Keep a labeled sketch so you can check that your calculator entries never count the same layer twice.

Should I round each section before adding?

Keep the measured volumes unrounded until you have a total. Then apply your allowance and round using the actual purchase unit. Rounding each small section separately can turn a single affordable delivery increment into multiple increments.

Can I compare bags with ready-mix by volume alone?

Volume gives you a common starting point. Then compare the bag count times price per bag against the delivered quote, including any short-load fee. Include dry weight, vehicle payload, mixing capacity and delivery access before deciding.

How do I calculate cubic yards of concrete?

Multiply length, width and thickness in feet, then divide cubic feet by 27. Convert inches of slab thickness to feet first. Any allowance you select is added separately.

How much concrete do I need for a 10 by 12 slab at 4 inches?

The measured volume is 40 cubic feet, or about 1.481 cubic yards. That excludes any allowance for uneven excavation, spillage or supplier ordering increments.

Is this a cement quantity calculator?

No. Cement is one ingredient in concrete. This tool estimates mixed concrete volume, not cement, sand or aggregate proportions for a site-mixed recipe.

Sources and editorial details

CubicPilot Editorial Team. Last content review .

Report a correction