Concrete Volume Calculator

Use this concrete calculator to estimate slab volume in cubic yards, cubic feet or cubic meters. Enter length, width and thickness, then add any measured sections.

Concrete Bag Calculator

Calculate how many bags of concrete mix you need from a measured volume and the mixed yield printed on your product. Results round up to whole bags.

Footing Concrete Calculator

Estimate concrete for rectangular or round footings from their dimensions and quantity. This footing calculator totals volume; it does not size foundations.

Fence Post Concrete Calculator

Calculate concrete for fence post holes using hole diameter, depth and quantity. Subtract the volume displaced by the embedded round or rectangular post.

Brick Calculator

Estimate how many bricks you need for a wall from its net area, brick face size and mortar joints. Subtract openings and choose a separate allowance.

Concrete calculators handle different parts of a purchase. A slab or footing tool finds mixed volume from dimensions, the bag tool turns that volume into whole packages, and the post tool subtracts embedded lumber. A brick wall needs a face-area count. Pick the tool that matches what you must buy.

Start by asking whether you need a volume, a number of bags or a piece count. A ready-mix quote commonly uses cubic yards. Bagged material needs its label yield, and a brick order needs face size and mortar joint. Record each separately before requesting prices.

Which calculator should you pick?

Select the tool by what you measure and buy
ToolWhen to use it
Concrete Volume CalculatorMultiply inside slab area by thickness, with additional rectangles if needed.
Concrete Bag CalculatorTurn a known concrete volume and label yield into whole bags.
Footing Concrete CalculatorEstimate specified rectangular runs or repeated round piers.
Fence Post Concrete CalculatorSubtract embedded post volume from cylindrical holes.
Brick CalculatorEstimate exposed brick faces and mortar modules.

Choose one calculator for each distinct order line. Concrete Volume Calculator · Concrete Bag Calculator · Footing Concrete Calculator · Fence Post Concrete Calculator · Brick Calculator

How do you go from a shed pad sketch to a quote?

Example 10 × 12 ft pad at 4 inches

  • 120 sq ft footprint
  • 10% example allowance and 0.60 cu ft example bag yield
  1. 120 × 4 ÷ 12 = 40 cu ft using slab dimensions.
  2. 40 × 1.10 = 44 cu ft for ordering.
  3. 44 ÷ 27 ≈ 1.630 cu yd.
  4. 44 ÷ 0.60 = 73⅓, so order 74 whole bags if using this product.

Ask for a ready-mix quote that covers 44 cu ft and compare it with 74 bag prices.

Check. 74 × 0.60 = 44.4 cu ft.

If each bag weighs 80 lb, the order is 5,920 lb dry. Compare delivery, minimum and short-load fees with bag costs, vehicle payload and unloading. See how to measure inside the slab forms.

What should stay on separate purchase lines?

Use the footing tool for dimensions already established in the project plan. Treat several different pier sizes as separate groups. Keep brick quantities apart from concrete volume and ask about pieces per pallet. Follow the product directions and local requirements. Call 811 before digging in the US.

The calculator methodology explains how the volume allowance and purchase rounding are applied.

What to check before ordering

  • Write down material, measured quantity and purchase unit on separate lines.
  • Compare the seller’s whole order and delivery terms.

Frequently asked questions

Do I calculate a slab or a footing first?

Calculate the shape you are actually filling. A slab needs length, width and thickness, while a footing can have another cross section. Keep both totals until you know whether their shared boundary has already been counted and whether they will be poured together.

When can I use the bag calculator directly?

Start with it if you already know the mixed volume and the label yield. Record whether the volume includes an allowance. If it does, set the bag tool’s allowance to zero so the buying quantity does not include the same reserve twice.

Which tool accounts for a post?

Use the fence post concrete tool for matching round holes with an embedded round or rectangular post. Use the actual post dimensions. If another hole is a different size, compute it separately and add the volumes only for the matching material order.

Can I use brick counts to order mortar?

The piece count uses mortar joint width to size each repeating module. A mortar bag estimate needs its own product coverage and layout assumptions. Ask for the product instructions and prepare a separate line for mortar and any other materials the wall needs.

Editorial details

CubicPilot Editorial Team. Last content review .

Report a correction